0

PK Migration Tool usage

I am prepping to upgrade to 5.0.2 and working through the pre-upgrade steps. After the upgrade the guide shows scripts that must be performed. The first is the PK Migration tool scripts. The instructions show a number of items needed for the tool. Most are straightforward but these two are not. What should be used for these prompts?

  • Maximum number of worker threads
  • Maximum size of Off-Heap memory in Gigabytes
Reply Oldest first
  • Oldest first
  • Newest first
  • Active threads
  • Popular
Like Follow
  • 1 mth agoLast active
  • 12Views
  • 1 Following

Product Announcement

Incorta 5 is now Generally Available