I think it would be great for us to have an ability to burst/schedule dashboards to run after the schema load is successful rather than scheduling the dashboard to run at a very specific time.
Scenario:
Suppose, we schedule a schema load to start at 08:50 AM (Usually takes around 2-3 min) and then we schedule a report based on this schema to run at 09:00 AM. We come across the situations, where the report is sent but the schema load isn't finished due to various reasons. This requires us to manually resend the dashboard. So, I think scheduling the reports with similar background to burst after the successful completion of the load instead of running at a specific time would be great.
I understand that this suggestion is very vague, but any steps in this direction would open up many doors for scheduling/bursting.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.