cancel
Showing results for 
Search instead for 
Did you mean: 

Next Run Time stamp - Strikethrough

BlackJack
Ranger

Hi,

I'm trying to schedule a schema load and the next run timestamp is strike-through.

The schedule never triggers as well.

Any help would be appreciated.

Thanks

7 REPLIES 7

Hi Brandon - We have this option disabled already.

BlackJack
Ranger

Hi @BrandonR  - Thanks. In the Tenant level configurations the pause is enabled. 

JeffW
Employee
Employee

If you see strike-through line through the next scheduled load, it means that "Pause Scheduled Jobs" has been enabled in the CMC.  Login to the CMC, Navigate to the Tenants tab.  For your Tenant click the Configure link and then the "Data Loading" tab.  Disable the "Pause Scheduled Jobs" option.  If this is already disabled (in the off position), then back in the incorta UI, from the schema load scheduler page, click on the filter icon next to the status column and select "Suspended". Look for your schema with status of suspended.  If you see it, then click on the status itself and it will change it back to Active.